2750 MEMBERS FIRSTMEMBER-LED. MEMBER-DRIVEN.MAILER 11–12 FULL BRIEFING

MAILER 11–12 / ATLAS AIR / AIR ATLANTA

Who gets
our flying?

Temporary cover.
Lasting questions about pilot careers.

Watch John’s first video and the earlier explainer. Explore the positions, contract provisions and voting clarification in one place.

Who gets our flying? Campaign cartoon showing management, Air Atlanta aircraft, four Atlas pilots and a Watch the explainer video invitation. PLAY THE EXPLAINER 8:33
FIRST VIDEO MESSAGE John shows the HAWKS lookup and answers a pilot’s question 4:13 →

JOHN CORCORAN / FIRST ON-CAMERA CAMPAIGN MESSAGE

Check the flying.
Hear John's response.

4 MIN 13 SEC

John opens the HAWKS Flight Finder, explains his November lookup and discusses what he wants the union to pursue on Air Atlanta and scope protection.

91AIR ATLANTAFLIGHTS REPORTED BY JOHN
NOVEMBER 1–30, 2026

John reports 91 Air Atlanta flight listings in HAWKS for November 1–30, 2026. This full-month count includes scheduled flights. It is not an independently verified total of completed flights or proven job displacement. See how he describes the lookup ↓

Complete recording · Picture enhanced; original audio preserved.

Mailer 12: voting + video ↗
Read the contract point alongside the video.

At about 02:55–03:22, John proposes an argument about lease rates and the 50% threshold. Lease payments alone do not change the equity percentage. Article 1.B.3.a combines at least 50% equity ownership with effective control; other provisions and exceptions also matter. The recording does not establish a CBA breach. Read the short explanation below ↓

FOLLOW THE LOOKUP HE DESCRIBES

Start with the same dates.
Check the filters and result.

Use your own authorized HAWKS access. Flight listings can change as schedules and operations change.

  1. 1
    Open Flight Finder

    Select All Flights.

  2. 2
    Set November 1–30, 2026

    Use the same start and end dates shown in John's video.

  3. 3
    Review the AC filter

    John describes using its dropdown to narrow the aircraft entries. Confirm which entries are selected.

  4. 4
    Read the resulting listings

    Check the date range, flight status and selection before comparing the number.

What the video raises—and what the records establish.

The investment and the company's position

Atlas announced a 49% minority equity investment and Titan's purchase and leaseback of aircraft owned by the Air Atlanta group. The company described expanded capacity and international access as benefits. John's account of the CEO's profit-sharing explanation is his reported account; that quoted exchange is not reproduced here.

Read the company's August 3 announcement ↗
Lease rates, equity and the contract threshold

The existing CBA's Related Entity definition requires 50% or more equity ownership and effective control. It also defines dry leasing and contains other scope provisions and exceptions. Higher lease payments do not themselves convert a 49% equity holding into 50%. Lease, control and operating records may inform an argument, but its merits require assessment under the actual contract and applicable process. John's proposed argument is not an adjudicated finding.

Read the CBA definition · PDF page 5 ↗
Information requests and negotiated protection

Article 1.I provides for information reasonably necessary to determine Article 1 compliance, subject to a standard confidentiality agreement where required. John's commitment to seek new language is a negotiating proposal. A new agreement requires the parties' agreement and applicable approvals; it is not guaranteed by an election result. His warning about future job loss expresses a concern, not a documented forecast.

Read Article 1.I · PDF page 11 ↗

Added November 9, 2026. Source: John's supplied 4:13 recording. Caption spelling has been normalized. Picture contrast and highlights have been adjusted to reduce glare; the full recording and original audio are preserved. HAWKS was not accessed independently for this briefing. The earlier explainer and its supporting discussion continue below.

01 / START HERE

Hear the whole explanation.

8 minutes 33 seconds

The supplied video explores the Air Atlanta arrangement, the competing explanations and the choices facing Local 2750 members.

Choose Play with sound to begin.

PDF breakdown
Keep the distinction clear.

The video contains interpretations and disputed claims. 49% alone does not settle every Article 1 issue. Assertions about secret profit flows, legal circumvention or other slates’ inactivity are not established findings. A new MOU would require agreement; an election cannot guarantee one. Read the specific clarifications ↓

02 / THE THREE PERSPECTIVES

Same flying. Different explanations.

These are the positions presented in the supplied video. Distinguishing them helps identify what the records need to answer.

MANAGEMENT’S EXPLANATION

A temporary capacity gap.

The video attributes the arrangement to 747-400 maintenance delays, parts and engineering constraints. It reports management’s assurance that Atlas crew members would not lose scheduled flying or pay.

What to examineAircraft availability, duration of outside flying and actual effects on pilots.

MEMBERS FIRST’S ARGUMENT

A lasting structural risk.

The campaign argues that aircraft ownership, leasing and commercial arrangements can leave pilots exposed. It calls for information requests, evidence-based enforcement and an immediate push for stronger written scope protection.

What to examineOwnership and control documents, lease terms, customer arrangements and flying records.

THE CURRENT BOARD’S RESPONSE

Review, bargaining and cooperation.

The video describes the board’s account of earlier bargaining efforts and initial discussions with Air Atlanta’s union. Its position is that measured communication should not be mistaken for acceptance.

What to examineDated requests, talks, grievances, responses and outcomes—not assumptions based on silence.

03 / FOLLOW THE SEQUENCE

What happened—and what is disputed?

COMPANY ANNOUNCEMENT

3 August 2026

Atlas announced completion of its 49% investment. Titan acquired aircraft owned by the Air Atlanta group and leased them back.

Read the company release ↗
REPORTED IN THE VIDEO

9 August → 5 September

The explainer describes outside flying starting on 9 August and an initially stated four-week period ending 5 September.

CAMPAIGN ALLEGATION

November flying

The campaign is described as alleging that flying continued beyond that period. Schedules and the governing arrangements need to be examined.

Explore the contract provisions ↓

The August 3 transaction is supported by the linked company release. Operational dates, the management memo and the board’s response are summarized from the supplied video; they are not presented here as independently reproduced original records.

04 / THE CONTRACT, IN PLAIN LANGUAGE

49% is only part
of the story.

“Scope” means the contract rules about which flying is covered and who performs it. Read the ownership test together with its conditions, exceptions and enforcement provisions.

49%Atlas’s announced
equity stake
↔
50%+Ownership limb of
the Related Entity test

Plus effective control. Other Article 1 provisions still matter.

1.B.3.a / dOwnership + control

The Related Entity definition combines 50% or more equity ownership with effective control. The contract defines control in terms of decisive authority, by contract or otherwise. A 49% stake is below that ownership limb; it does not decide every other Article 1 question.

Read the CBA · PDF page 5 ↗
1.B.3.b / cAircraft ≠ crew

The definition of covered flying excludes another entity’s flying under a dry lease: an aircraft lease where the company or related entity does not supply the crew. Aircraft ownership and the right to perform flying are different questions.

Read the CBA · PDF page 5 ↗
1.C / 1.DTransfers + subcontracting

Article 1.C addresses specified aircraft transfers that directly cause a reduction in force. Article 1.D defines subcontracted revenue flying and includes conditions, notice, information rights, time limits and exceptions. Commercial arrangements have separate treatment in 1.D.8.

Read the CBA · PDF page 6 ↗
1.IRequest the records

The union may request documents and information reasonably necessary to determine Article 1 compliance. Proprietary or confidential material may require a standard confidentiality agreement.

Read the CBA · PDF page 11 ↗
1.J / 1.HTest the arrangement

The contract prohibits creating an alter ego to avoid the agreement. Article 1.H provides an expedited arbitration route for Article 1 grievances. Whether a particular arrangement violates the contract requires evidence and the applicable process.

Read the CBA · PDF page 11 ↗
1.A.3Put any new deal in writing

Subsequent amendments must be written and signed by authorized representatives. An MOU can be pursued during a contract, but obtaining it depends on agreement and applicable approval requirements.

Read the CBA · PDF page 4 ↗

Source: the existing 2021 CBA text, including its conditions and exceptions. Later amendments and the facts of particular flying must also be checked. These summaries are not a ruling on this dispute. CBA links may require membership confirmation.

05 / THE MEMBERS FIRST PROPOSAL

Get the records. Test the protections.
Seek a written agreement.

01

Request the evidence.

Use Article 1.I to seek the ownership, control, lease, flying and employment records needed to assess compliance.

02

Apply the contract.

Use qualified advice to assess the relevant provisions and pursue evidence-supported claims through the agreed process.

03

Pursue stronger terms.

Seek an MOU addressing the identified scope risks. Define the protection sought and report progress to members.

A commitment to pursue—not a guaranteed outcome.

The video cites earlier mid-contract agreements as examples of negotiation being possible. They do not establish that a scope MOU can be obtained on demand. New terms require agreement and applicable approvals.

06 / READ THE DETAIL

Important clarifications to the video.

The original video is presented intact. These notes identify statements that need a more precise reading; they do not turn disputed assertions into findings.

02:19–03:20Ownership is not the whole scope analysis.+

The video describes the 50% threshold as if coverage followed automatically, then says the 49% structure falls outside the contract. Article 1.B.3.a requires 50% or more ownership and effective control, with other scope provisions and exceptions also relevant. The actual flying and commercial arrangements must be examined before deciding whether Article 1.D applies.

04:50–05:22Profit-flow and inactivity assertions remain unproved here.+

The transaction announcement establishes aircraft ownership and leasing. It does not establish secret profit transfers, unlawful or lawful circumvention, displacement of specific work, or that only one slate has acted. Those assertions require financial and operating records and a fair account of existing union action.

05:38–06:15 / 07:47An MOU is a negotiating objective.+

The existence of earlier amendments does not guarantee agreement on different scope terms. A slate can commit to seeking protection and explaining its progress; it cannot unilaterally force the company to sign. Existing contractual remedies must be evaluated separately from new bargaining proposals.

07 / SOURCES & FURTHER READING

Follow the explanation back to its sources.

Primary source for this mailer’s six-chapter breakdown: the supplied 8:33 narrated explainer. The management and board summaries above are attributed to that recording. Original operational memos, schedules, lease terms and dispute records are the appropriate evidence for testing those statements. Earlier explainer prepared November 6, 2026; John’s video added November 9, 2026.

YOUR FLYING. YOUR FUTURE.

Watch it. Question it.
Know what protection you’re asking for.

Mailer 11–12 sharing preview

Share the full explanation.

Share both videos, the mailers and supporting sources with your fellow members.